Our Services
Professional septic solutions from design to installation — serving Northwest Arkansas and Southwest Florida.
Perc Test
Land Under ContractA percolation test using soil morphology determines how well your soil absorbs water — the critical first step in sizing and siting any septic system. PERCPRO® excavates at least 2 pits on-site and DOES NOT submit results to ADH.
PercPro® excavates at least 2 pits on-site — soil morphology read by our certified technician
Requirements
- Land Under 1/2 Acre
- Land under contract (not yet owned)
- Pit excavated and read by PERCPRO®
- Results used for due diligence
- Letter emailed to you while technician onsite
Conceptual Plan
Land Under ContractA plot plan showing the proposed septic system layout — tank location, drain field, setbacks, and site features. Used to determine maximum house dimensions. Very useful in Bella Vista.
Example conceptual plan — showing field lines, setbacks, pit locations, and loading rates
Requirements
- Land Under 1/2 Acre
- Pit dug and evaluated by PERCPRO®
- Plot plan showing tank, field & setbacks
- Typically email drawings 48 hours after site visit
ADH Permitting
Builder or Owner Can ApplyPERCPRO® handles the full Arkansas Department of Health permitting process — site evaluation, pit excavation, engineered plan, and ADH submission. Land does not have to be owned; a builder can apply for the permit.
Example ADH-approved permit plan — stamped by PERCPRO®'s designated representative
Requirements
- Builder or landowner can apply
- Parcel number required
- Exterior building dimensions required
- At least 2 pits excavated by PERCPRO®
- We manage ADH submission
- Full regulatory compliance
ADH Permit Fees
| Structure Size | Fee |
|---|---|
| 1,500 sq ft or less | $30 |
| 1,501 – 2,000 sq ft | $45 |
| 2,001 – 3,000 sq ft | $90 |
| 3,001 – 4,000 sq ft | $120 |
| Over 4,000 sq ft | $150 |
| Alteration & Repair | $30 |
Septic System Installation
Approved Permit RequiredFull installation of your new septic system — tank, drain field, and all components — once your ADH permit is approved. Send us your approved permit before scheduling.
Completed PERCPRO® installation — tank lids set, drain field laid, site staked and ready for ADH sign-off
Requirements
- ADH-approved permit required before scheduling
- Tank, drain field & all components installed
- Work inspected and signed off by ADH
- Site restored after installation
- PERCPRO® owns the design and install, no back and forth between designers and installers, any changes are seamless and fast
Septic Inspection
Existing SystemNot sure if your existing system is working properly? Our certified inspectors evaluate the tank, drain field, and components and provide a written condition report with any recommended repairs.
Example residential existing septic form — Benton County Building Safety
Requirements
- Existing septic system required
- Tank, field & components evaluated
- Written condition report provided
- Repair recommendations included
System Maintenance
Existing SystemScheduled service to keep your septic system running reliably. Regular maintenance extends system life and prevents the costly failures that come from neglect.
Example onsite wastewater plan — Spring Creek Estates, designed by PERCPRO®
Requirements
- Scheduled service available
- Extends system lifespan
- Prevents costly failures
Subdivision Permitting
3+ Units on 1 ParcelRequired when a single parcel is split 3 or more times and any resulting parcel is under 3 acres. PERCPRO® manages the full multi-parcel permitting process with ADH from start to finish.
Requirements
- 1 parcel split 3 or more times
- At least one resulting parcel under 3 acres
- We manage all subdivision permitting
RV Parks & Campgrounds
Multi-Unit DevelopmentFull-service design, permitting, and installation for RV parks and campgrounds. PERCPRO® has onsite plumbers and handles everything from water mains to sewer mains to septic systems — no coordinating between separate contractors.
Example multi-unit wastewater plan — full design and permitting by PERCPRO®
Requirements
- Onsite plumbers on staff — no subcontracting
- Water main design and installation
- Sewer main design and installation
- Septic system design and installation
- Full permitting through ADH and local authorities
- Ongoing maintenance programs available
- Single point of contact from design to completion
Not sure which service you need?
Give us a call or request a project online and we will walk you through the right process for your situation.